I will assume this is a true or false question, the answer is true. Requirements analysis, likewise called requirements engineering, is the way toward deciding client desires for another or altered item. These elements, called necessities, must be quantifiable, significant and point by point. In programming building, such necessities are frequently called utilitarian particulars.
the price is 546
because you add all that and you get that muchh
Answer:
11.3%
Explanation:
Given that,
Growth rate of industrial production, IP = 4%
Inflation rate, IR = 3.0%
Beta = 1.1 on IP
Beta = 0.5 on IR
Rate of return = 7%
Before the changes in industrial production and inflation rate:
Rate of return = α + (Beta on IP) + (Beta on IR)
7% = α + (1.1 × 4%) + (0.5 × 3%)
7% = α + 4.4% + 1.5%
7% - 4.4% - 1.5% = α
1.1% = α
With the changes:
Rate of return:
= α + (Beta on IP) + (Beta on IR)
= 1.1% + (1.1 × 7%) + (0.5 × 5%)
= 1.1% + 7.7% + 2.5%
= 11.3%
Therefore, the revised estimate of the expected rate of return on the stock is 11.3%.
Answer:
$1,901,385
Explanation:
First unit produced by lambda took 5,000 hours to produce and required $30,000 worth of materials and equipment usage.
The second unit took 4,500 hours and used $24,000 worth of materials and equipment usage.
learning rate = time needed to produce second unit / time needed to produce first unit = 4,500 hours / 5,000 hours = 90%
materials and equipment usage rate = $24,000 / $30,000 = 80%
using the attached table of cumulative values, we can determine the cumulative improvement factors needed to solve this question:
Olsan's accumulated cost for producing 20 more guidance controls
-
work hours = 4,500 x 14.61 (90% and 20 units) x $25 per hour = $1,643,625
- materials and equipment = $24,000 x 10.74 (95% and 20 units) = $257,760
- total = $1,901,385