I believe the answer is: D. patriotism
Patriotism is the act of showing vigorous support to our own country . The support that shown in patriotism does not revolve around financial decision, but more to how our country is perceived in its foreign nation relative to the other countries.
a. the first physical depiction of a new product is the best otion A prototype is the physical form of an idea or concept, usually in a model.
Answer:
The correct answer is B. Correct! Since Ace is not in control of the actions of Kosier (an independent contractor), Ace would generally not be responsible for Kosier's torts.
Explanation:
An independent contractor is a person who is hired to do a specific job. It is said that she is her own boss because she controls how and where the work is done.
These people have greater freedom and only undertake to perform the specific function they agreed with the person owning a company. For example, the independent contractor agrees that he will serve clients at a 9 a.m. store. at 1 p.m. or that he will go to the meetings and prepare a report on the subject assigned to him. Outside these specific functions, the independent contractor controls how he manages his time.
Answer:
Explanation:
Run A Duration B Duration C Duration 1 51 48 17 2 60 48 19 3 30 39 19 4 31 48 22 5 30 31 14 6 41 16 17 7 44 12 6 8 44 12 10 9 45 43 9 10 60 41 10 Based on the simulated numbers given above, what is the average completion time of the whole project?
Since B is the predecessor of C.
Project completion time for each run will be calculated as Maximum (Duration of A, Duration of B +Duration of C).
Represent
Run = R
Duration of A = DA
Duration of B = DB
Duration of C = DC
Project Completion time = PT
<u>R DA DB DC PT</u>
1 51 48 17 48 + 17 = 65
2 60 48 19 48 + 19 = 67
4 31 48 22 48 + 22 = 70
5 30 31 14 31 + 14 = 45
6 41 16 17 41
7 44 12 6 44
8 44 12 10 44
9 45 43 9 43 + 9 = 52
10 60 41 10 60
<u> Total = 546</u>
Total Project completion time in 10 Stimulations = 546
Average project Completion time = 546/10 = 54.6
Therefore, average Project completion time is between 53 and 56 days.