Answer:
As critical path is the longest path during estimation,so 50 days is maximum time to complete this project.So probability to complete a project before 0n 50 days or before 50 days days is 1
Pr=1
X=35 and y= 130.
similar triangles have at least 2 congruent angles.
ABC = 130, 35 and 15
DEF = 130, 35 and 15
so B) the triangles are similar because y=130 and there are 3 pairs of congruent angles.
The answer would be $9.00 for each individual adult ticket. Hope this was helpful! :)
Omg at school recently we learned the exact same thing.
(x-8)+4x=7x-16
5x-8=7x-16
-5x -5x
-----------------
-8=2x-16
+16 +16
-----------------
8=2x
4=x
7(4)-16
The answer is 12*