Answer:
The temperature in the greenhouse was at least 68 degrees before the heater stopped working.
Step-by-step explanation:
It was at 68 then it dropped by 2 degrees.
Answer:
Option C) 146.5
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 130 weeks
Standard Deviation, σ = 10 weeks
We are given that the distribution of completion time is a bell shaped distribution that is a normal distribution.
Formula:
P(X<x) = 0.95
We have to find the value of x such that the probability is 0.95
P(X < x)
Calculation the value from standard normal z table, we have,
The project should be completed in 146.5 weeks or less.
Hence, 146.5 weeks should be set the due date such that there is a 95 percent chance that the project will be finished by this time.
Answer: 54 square feet
Step-by-step explanation:
To find perimeter of a rectangle we must use the formula l+l+w+w=p where l and w represent width and length
Since we know length and width is x=12 just substitute so
15+15+12+12=54 so 54 is the perimeter
Answer:
y=2x
Step-by-step explanation:
rise/run 2/1