Answer:
27 days
Step-by-step explanation:
A alone, rate per day = 1/36
A and B together, rate per day = 1 / 20
Total Workdone for 5 days :
1/ 20 * 5 = 5 / 20 = 1/4
Fraction of work left :
1 - 1/4 = 3/4
3 / 4 * 36 /1
= (3 * 36) / 4
= 108 / 4
= 27 days
Answer:
A. Dilation of scale factor 2
B. Reflection over the y-axis
C. Reflection over the line y=x
D. Translation 1 unit left and 1 unit up
Answer:
1.) 2/5
2.) -7/5
Step-by-step explanation:
Slope Formula: m = y2 - y1/x2 - x1
1.) 2/5
m = y2 - y1/x2 - x1
m = -1 - (-3)/0 - (-5)
m = -1 + 3/0 + 5
m = 2/5
2.) -7/5
(-2,3) and (3,-4)
m = y2 - y1/x2 - x1
m = -4 - 3/3 - (-2)
m = -4 - 3/3 + 2
m = -7/5
hm//jhfjvxxdfcgjhkjlkl.jjkmmbvdxfoknkbkbkbhb
Answer:
13 centimeters per day.
Step-by-step explanation:
We have been given that during summer, the water level of the river increased by 78 centimeters in 6 days. We are asked to find the water level increase rate in centimeters per day.
To find the water level increase rate per day, we will divide total increase by total days as:
Therefore, the water level increase rate is 13 centimeters per day.