Answer:
Explanation:
Given the coordinates of the triangle as:
B(2, -8), C(-6, -2), and D(-7, -5)
The area is obtained using the formula:
Using the given parameters, we have:
Answer:
Option A = 75 is the best option
Step-by-step explanation:
It took Ashlie 2.5 hours (11:30 am - 2pm) to assemble the marketing packets
Rate = Number of jobs done/Time taken = 90 packages/hr
Number of jobs done = Rate * Time taken = 90 * 2.5 = 225 packages.
Dwayne has assembled the same number of packages = 225 (as reported in the question),
It took Ashlie 2.5 hours (11 am - 2pm)
Then, his work rate is calculated as: Number of jobs done/Time taken = 225 packages/3 hours = 75
Thus, option A = 75 is the best option
Since the solution to the system of equation is 12 and -12, hence the equation has 2 solutions
<h3>Modulus functions</h3>
Modulus functions are functions that can either be positive or negative. Given the modulus function below;
|h| − 8 = 4
The modulus of h can both be negative and positive
If the modulus of h is positive then;
h - 8 = 4
Add 8 to both sides
h-8 + 8 = 4 + 8
h = 4 + 8
h = 12
If the value of h is negative
-h - 8 = 4
-h = 4 + 8
h =-12
Since the solution to the system of equation is 12 and -12, hence the equation has 2 solutions
Learn more on modulus function here: brainly.com/question/23450491
#SPJ1
The formula is
A=p (1+rt)
A future value 1249.22
P present value ?
R interest rate 0.14
T time 1 year
We need to solve for p
P=A÷(1+rt)
P=1,249.22÷(1+0.14×1)
P=1,095.81 round your answer
P=1096
Hope it helps