Answer:
Step-by-step explanation:
Given
Therefore,
s = hours it takes the small pipe on its own.
L = hours it takes the large pipe on its own.
we know the small pipe can do it in 11 hours total, so s = 11, so, how much of the whole job has the small done in 1 hour only?
well, if it takes 11 hours to do the whole thing, in 1 hour it has done only 1/11 of the whole job.
we know both pipes working together can do it in 6 hours flat. So in 1 hour only, both of them have done only 1/6 of the whole thing.
in that 1 hour, how much has the large one done? well, it has only done 1/L of the job.
and you can round that up as needed.
I believe it is 56.55 inches I could be wrong but I tried my best
First page:
1. Linear
2. Non linear
3. Linear
4. Non linear
5. Non linear
6. Linear
7. Linear
8. Non linear
Second page
1.
2.
3. Linear
4.
5.
5a.
5b.
5c.