C = 220T + 1890.
Solve the equation for T.
220T = C - 1890
T = C/220 - 8.6
The steel produced is expected to be sold at a price of $310 per ton.
310 $/ton is a rate or slope. Write a linear equation where x is tons of steel produced and y is selling price of the steel.
y = 310x
Write and solve an equation to find the amount of steel produced if the selling price is equal to the cost of production.
* Here, note that the cost of production and tons of steel in the first equation is in the millions. The equation we just wrote for the selling price was in x tons of steel. This only matters in regards to the units you specify because; million/million = 1
The unit multiplier of all variables must be specified as same. Either everything is in millions or not.
Here, I'll leave everything in millions, change x (tons of steel) to T (mill tons steel) and "y" to "S" in million dollars selling price.
S = 310T
Set equal to Cost equation.
220T + 1980 = 310T
Solve for T, million tons of steel produced.
1980 = 310T - 220T
1980 = 90T
T = 1980/90
T = 22 million tons steel produced
Answer:
...
Step-by-step explanation:
Answer:
I know you said no guessing, but I'm assuming it's the first one, F.
Answer:
There are 2000 nibbles in 1 kilobyte
Step-by-step explanation:
If she leaves 15 minutes earlier than Allen, she would have to drive at 56.47 mph to arrive at the same time as Amber
<h3>What is an
equation?</h3>
An equation is an expression that shows the relationship between two or more number and variables.
Amber travels at a speed 60 mph, hence the time taken (t) is:
60 = 240/t
t = 4 hours
If he leaves 15 minutes earlier, the time would be 4 hr + 0.25 hr (15 min) = 4.25 hr, hence:
Speed = 240 miles / 4.25 hr = 56.47 mph
If she leaves 15 minutes earlier than Allen, she would have to drive at 56.47 mph to arrive at the same time as Amber
Find out more on equation at: brainly.com/question/2972832
#SPJ1