Work done by a given force is given by
here on sled two forces will do work
1. Applied force by Max
2. Frictional force due to ground
Now by force diagram of sled we can see the angle of force and displacement
work done by Max =
Now similarly work done by frictional force
Now total work done on sled
Answer: b is sedimentary. c is metamorphic. and a is igneous.
Explanation:
Uh so I'm no master at this subject, but all stuffs accelerate at 9.8 m/s squared. So you multiply the 9.8 and the 0.20 it's given for reasons unknown other than that's what I see in my notes... and that gives you 1.96 m/s squared.
As for B, I have no idea. I think you may multiply the 1.96 by 4. Tell me your thoughts and maybe we can work it out together
Answer:
<em>U = 66,150 J</em>
Explanation:
<u>Gravitational Potential Energy</u>
Gravitational potential energy is the energy stored in an object because of its vertical position or height in a gravitational field.
It can be calculated with the equation:
U=m.g.h
Where m is the mass of the object, h is the height with respect to a fixed reference, and g is the acceleration of gravity or .
The child of mass m=45 Kg is perched above a h=150 m ravine. His gravitational potential energy is:
U = 66,150 J
Answer:
48m
Explanation:
- Initial velocity = 4m/s
- Acceleration = 4m/s²
- Time = 4s
- Displacement = ?
From Second equation of motion ,
s = ut + 1/2at²
s = 4*4 + 1/2*4*(4)² m
s = (16 + 2 * 16) m
s = ( 16 + 32 )m
s = 48 m