A worker can assemble 3 shelf units each hr. During the 5th hr...so the shift has been going on for 5 hrs...at 3 units per hr = (3 * 5) = 15 units assembled during the shift....and if there was 115 units in the warehouse, then that means before the shift, there were (115 - 15) = 100 units assembled <=
Answer:
Step-by-step explanation:
y = mx + b
we can see the slope is down hill, so it's negative
when the X is zero then it's 2
b = 2
slope is rise over run 2/3
y = -2/3x + 2
the slope is -2/3 (note the negative)
the y intercept is 2
Answer:
a) 0.2
b) 0.2
c) 0.5
Step-by-step explanation:
Let be the event "the car stops at the signal.
In the attached figure you can see a tree describing all possible scenarios.
For the first question the red path describes stopping at the first light but not stopping at the second. We can determine the probability of this path happening by multiplying the probabilities on the branches of the tree, thus
For the second one the blue path describes the situation
For the las situation the sum of the two green path will give us the answer