Answer:
A multiple choice offshore suppliers are changing the way work
<h2>Answer : Option A) 1 foot/second</h2><h3>Explanation :</h3>
If we consider that the plates are placed 2 ft apart and there has to be 1800 meals that needs to be delivered in an hour.
so if we multiply 2 ft and 1800 meals that is delivered in 1 hour,we get 2 X 1800 = 3600 meals in an hour.
If we try to accommodate the plates at each ft then there will be 3600 meals delivered in 1 hour.
we know that 1 hour has 3600 seconds in it.
So, here the distance is 1 ft, and speed has to be determined time is 1 hour = 3600 seconds
3600 meals / 3600 seconds = 1 foot per second.
OR 1800 meals set at 2 ft apart in 3600 seconds will give the speed of the belt as 1 foot per second.
(1 ft = speed X 1 hour)
<h2>so, the speed also will be 1 foot per second. </h2>
the preferred debt to income ratio is usually B 36%
Answer:
Economic growth generates job opportunities and hence stronger demand for labour, the main and often the sole asset of the poor. In turn, increasing employment has been crucial in delivering higher growth.