Answer:
0.82%
Step-by-step explanation:
First find the z-score.
z = (x − μ) / σ
z = (72 − 60) / 5
z = 2.4
Use a chart or calculator to find the probability.
P(Z > 2.4) = 1 − P(Z < 2.4)
P(Z > 2.4) = 1 − 0.9918
P(Z > 2.4) = 0.0082
Answer:
.75
Step-by-step explanation:
1/4 OF 1 IS 25. 1.00-.25 IS .75.
Answer:
-4 or undefined
Step-by-step explanation:
Answer:
x=6561
Step-by-step explanation:
We can solve this equation for x to get
Answer:
C
Step-by-step explanation:
We want a line of best fit, which means we want to create a line that the data points will lie closest to.
One thing we can do is find the slope between the bottom-leftmost point and the top-rightmost point. This is because if we were to draw a line connecting these two, it will cut through the data quite well.
Those two points are (9, 15) and (16, 18), so the slope is change in y divided by the change in x:
(18 - 15) ÷ (16 - 9) = 3 ÷ 7 ≈ 0.4
Eliminate A and B.
Now we need to determine the y-intercept. This needs no calculations; simply look at the graph: there's no way a line cutting through the y-intercept point of (0, 18) will perfectly match the data points; instead it must be a y-intercept lower than 18. So, eliminate D.
The answer is C.