WE CALCULATE POWER AND RATE OF DOING WORK IS CALLED POWER
Using the Debroglies equation,energy can be found,as 1.9773*10*-9
then, energy* wave length= hc
c is the speed of light and is the planks constant.
wave length =1.006*10*-16 m
Answer:
Explanation:
Remark
In general, these 3rd class levers are very inefficient. Because the force distance is smaller than the load distance, you need to pull upward with more force that the weight of the load. So whatever the load is, the force is going to be much greater.
The distances are always measured to the pivot unless you are asked something specific otherwise.
Givens
F = ?
weight = 6N
Force Distance = F*d = 0.5 m
Weight Distance =W*d1 = 2 m
Formula
F*Fd = W*Wd
Solution
F*0.5 = 6 * 2 Divide by 0.5
F = 12/0.5
F = 24 N upwards
Answer:
t = 5.59x10⁴ y
Explanation:
To calculate the time for the ¹⁴C drops to 1.02 decays/h, we need to use the next equation:
(1)
<em>where : is the number of decays with time, A₀: is the initial activity, λ: is the decay constant and t: is the time.</em>
To find A₀ we can use the following equation:
(2)
<em>where N₀: is the initial number of particles of ¹⁴C in the 1.03g of the trees carbon </em>
From equation (2), the N₀ of the ¹⁴C in the trees carbon can be calculated as follows:
<em>where : is the tree's carbon mass, : is the Avogadro's number and : is the ¹²C mass. </em>
Similarly, from equation (2) λ is:
<em>where t 1/2: is the half-life of ¹⁴C= 5700 years </em>
So, the initial activity A₀ is:
Finally, we can calculate the time from equation (1):
I hope it helps you!