B=(2a/h) - a is the answer.
Answer:
$ 1250
Step-by-step explanation:
output = 50 units per day
average total cost = $ 60
total cost = output × average total cost =50 × 60 = $ 3000
total variable cost = output × average variable cost = 35 × 50 = $ 1750
total cost = total fixed cost + total variable cost
total fixed cost = total cost - total variable cost = $ 3000 - $ 1750 = $ 1250
Ab+ac=a(b+c)
a is common factor
factor
6ab=2*3*a*b
9bc=3*3*b*c
common factor is 3*b or 3b
3b(2a)+3b(3c)=3b(2a+3c)
Since M is parallel to N that means they would have to equal each other.
Since it's a linear equation and there's a constant rate (given in the problem), we can choose our x - axis to be the time and the y - axis to be height. We choose it that way because you are going up in the elevator. The more time in the elevator, the higher you go.
Finding this equation uses the point slope formula, y - y₁ = m(x - x₁). It can be done with slope-intercept, y = mx + b too.).
First we need to get the slope of the line. Choose any two points, but be consistent and choose two y points as well as the matching x ones. Here, we use x₁ = 2, x₂ = 4, y₁ = 45, y₂ = 75. Slope, m, is y₂ - y₁ / x₂ - x₁.
m = 75 - 45 / 4 - 2
= 30 /2
= 15
Next, we use the slope of 15 and either of the points to find the linear equation. Choose the same (2, 45) x-y pair above, but any point will work.
y - 45 = 15 (x - 2)
y - 45 = 15x - 30
y = 15x + 15
So the linear equation representing this table us y = 15x + 15.