The work done to pull the object 7.0 m is the total area under the graph from 0.0 m to 7.0 m, determined as 245 J.
<h3>Work done by the applied force</h3>
The area under force versus displacement graph is work done.
The total work done by pulling the object 7 m, can be grouped into two areas;
- First area, A1 = area of triangle from 0 m to 2.0 m
- Second area, A2 = area of trapezium, from 2.0 m to 7.0 m
A1 = ¹/₂ bh
A1 = ¹/₂ x (2) x (20)
A1 = 20 J
A2 = ¹/₂(large base + small base) x height
A2 = ¹/₂[(7 - 2) + (7-3)] x 50
A2 = ¹/₂(5 + 4) x 50
A2 = 225 J
<h3>Total work done </h3>
W = A1 + A2
W = 20 J + 225 J
W = 245 J
Learn more about work done here: brainly.com/question/8119756
Objects can only go so fast and that speed is called terminal velocity. so the answer is A
Answer:
3.57 MJ
Explanation:
ASSUMING it's fresh water with density of 1000 kg/m³
W = ΔPE = mgΔh = 14.0(1000)(9.81)(26.0) = 3,570,840 J
Salt water would require more.
Search Results<span>By simply wrapping wire that has an electrical current running through it around a nail, you can make an electromagnet. When the electric current moves through a wire, it makes a magnetic field. ... You can make a temporary magnet by stroking apiece of iron or steel (such as a needle) along with a permanent magnet.
Hope This Helps!</span>
I don’t even know I’m so dumb.