the sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find
the speeds of each.
1 answer:
Answer: 1st train = 364 mph, 2nd train = 356.2
Step-by-step explanation:
Train 1: x + 7.8
Train 2: x
Train 1 + Train 2 = Sum
x + 7.8 + x = 720.2
7.8 + 2x = 720.2
2x = 712.4
x = 356.2
Train 1: x + 7.8
= 356.2 + 7.8
= 364
You might be interested in
Answer:
yjajsjsuwjjajaiwija
I think it is $4284 b/c you would do $25.5*7 hours*12 days*2 workers=$4284 total
My best guess is a line graph because it shows the consistent numbers and then you can lay them all out after you have completed the graph
Population mean = (7+8+6+6+6+4+4+1+2+7+6+1+1+1+3+3+5+4+5+7) / 20 = 87/20 = 4.35 <==
sample mean = (4+5+7) / 3 = 16/3 = 5.33 <==