It could be that you type the numbers accidentally and that should have made the numbers appear. Well if you want to get rid of it you just need to remove that on the soft copy and then print the resume again. Doing so should have eliminate those 0`s printed on the resume.
<span />
Answer:
you should prepare 180 pounds of the deluxe mix and 75 pounds of the economy mix
Explanation:
maximize 7d + 4.7e
constraints
0.5d + ¹/₃e ≤ 115
0.5d + ²/₃e ≤ 140
d ≥ 0
e ≥ 0
d and e are integers
using solver, the maximum profit is 180d + 75e, and the maximum profit is $1,612.50
Kids in grade school have a maximum percentage of 32 reasons that Option (d) is the correct answer.
<h3>why are the grade-school-aged kids surveyed?</h3>
Korey did the market analysis section of his business plan after conducting a population survey of 3,520 homes within a 5-mile radius.
He discovered that younger children who read comic books as children are more likely to read them as adults, resulting in a current and future client base.
For more information about the market analysis survey, refer below
brainly.com/question/3886071
Answer:
Projects E,F and G should NOT be considered.
Optimal Capital is $5,750,000
Explanation:
The accept-or-reject rule, using the IRR method, is to acceptthe project if its Internal Rate of Return (IRR) is higher than theWeighted Average Cost of Capital(k) [r>k]. The project shall berejected if its internal rate of return is e lower than theWeighted Average Cost of Capital cost of (r<k)
Accept if r>k
Reject if r<k
Mayaccept if r = k
If the Weighted Average Cost of Capitl (WACC) is less than IRRrate, then the project has positive NPV; if it is equal to IRR, theproject has a Zero NPV, and if it is greater than the IRR, theproject has negative NPV.
The projects should be accepted as the rate of return on theproject is higher than the WACC(10.8%) which means that theprojects will be profitable as the returns are higher than the costof the project (capital). Considering this projects E,F and G should NOT be considered.
And considering the sizes the Optimal Capital is $5,750,000 (the addition of sizes of all projects)
The answer is true because empowerment is a positive thing which leads to a positive outcome.