Answer:
Results are below.
Explanation:
<u>To calculate the activities rate, we need to use the following formula:</u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Designing= 444,000/13,000= $34.15 per designer hour
Sizing and cutting= 4,210,000 / 169,000= $24.91 per machine hour
Stitching and trimming= 1,490,000 / 75,500= $19.73 per labor hour
Wrapping and packing= 332,000 / 32,000= $10.38 per finished unit
Cost of preferred stock Taylor Systems has just issued preferred stock. The stock has a 12 % annual dividend and a $100 par value and was sold at $97.50 per shar
Usually it isn't done much, because of the penalty of bad grades, and because frankly, the professors have seen it before, and therefore, only the boldest would consider it.
The worlds most largest national economy in nominal terms. Is the second largest in purchasing power parity (ppp).
representing 22 percent of nominal global gpd and 17 percent of gross world product (gwd)