Answer:
Using PEMDAS, we would first divide 24/8=3. Then, since there is no multiplication or division left, we can finish up with adding and subtracting. So, 48+3-22=29.
So 29 is the answer.
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
D because it does not specify when he would buy a house
So the division of a number and -9 or
x/-9
+10=11 or
(x/-9)+10=11
subtract 10 from both sides
x/-9=1
multiply both sides by -9
x=-9
Using the binomial distribution, there is a 0.3474 = 34.74% probability of getting one wrong number.
<h3>What is the binomial distribution formula?</h3>
The formula is:
The parameters are:
- x is the number of successes.
- n is the number of trials.
- p is the probability of a success on a single trial.
For this problem, the values of the parameters are given by:
p = 0.15, n = 10.
The probability of getting one wrong number is P(X = 1), hence:
P(X = 1) = C(10,1) x (0.15)¹ x (0.85)^9 = 0.3474
0.3474 = 34.74% probability of getting one wrong number.
More can be learned about the binomial distribution at brainly.com/question/24863377
#SPJ1