Answer:
$1800 at 9% and $1000 at 6%
Step-by-step explanation:
Not needed
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
<h2>The answer is option C</h2>
Step-by-step explanation:
<h3>
</h3>
Using the rules of indices
Since the bases are the same and are dividing we subtract the exponents
That's
<h3>
</h3>
So we have
<h3>
</h3>
Using the rules of indices
<h3>
</h3>
So we have the final answer as
<h2>
</h2>
Hope this helps you
Answer: .6 ft. every hour
Step-by-step explanation: when you add the amount of feet added each hour you get .6 ft.