Factor because if we have
yz=0 then we can assume y and/or z=0
so factor
so the easiest way is to find what 2 numbers add to -6 and multiply to get 9 so
we know that they must be both - because we must have x+x=(-) and x^2=+ so therefor they must be negative
factors of 9=3 and 3 so
-3 and -3
-3+-3=-6 perfect
(z-3)(z-3)=0
set each to zero
z-3=0
add 3
z=3
z=3 is the answer
So,
720 pt./hr.
2 pt. = 1 qt.
720/2 = 360
360 qt./hr.
Now, since there are 60 mins. in 1 hr., multiply the number by 60.
360(60) = 21600
720 pt./hr. = 21,600 qt./min.
Answer:
A
Step-by-step explanation:
Given
4n² + 4(4m³ + 4n² ) ← distribute terms in parenthesis by 4
= 4n² + 16m³ + 16n² ← collect like terms
= (4n² + 16n²) + 16m³
= 20n² + 16m³
= 16m³ + 20n² ← in standard form → A
Answer: 51 %
Step-by-step explanation:
3.5 * 5 = 17.5
17.5 = x/100 * 34
17.5 = 34x/100
17.5 * 100 = 34x
1750 = 34x
x = 1750/34
x = 51.47
rounded to 51%