Answer:
110 = 12
110 + 110 + 110 + 110 = 440
so 110 × 4 = 440
4 × 12 =<em><u> 48 days</u></em>
hope this helps
Answer:
The bottom cutoff heights to be eligible for this experiment is 66.1 inches.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Mean of 69.0 inches and a standard deviation of 2.8 inches.
This means that
What is the bottom cutoff heights to be eligible for this experiment?
The bottom 15% are excluded, so the bottom cutoff is the 15th percentile, which is X when Z has a pvalue of 0.15. So X when Z = -1.037.
The bottom cutoff heights to be eligible for this experiment is 66.1 inches.
Answer:
∴ x= 17
Step-by-step explanation:
the total of angel in 90°
∴ 2x+3+3x+2 =90
∴ 5x +5 =90
5x=90-5
5x = 85 (divide both side by 5)
∴ x= 17