Answer:
Pretty sure its 7 and 8
Step-by-step explanation:
test it out
Answer:
Step-by-step explanation:
30 30 x 3 = 90
x 3
90
first multiply 4 x 5 = 20 bring down 0 then multiply 4 x 2 = 8 then add+2= 10
25 x 4 = 100
12 x 15 = 180
Based on the costs to AP Evilene Company which makes industrial-grade brooms, the classifications of the costs are:
- Product and Manufacturing
- Period and nonmanufacturing
- Product and Direct labor
- Period and nonmanufacturing
- Product and Manufacturing
- Product and Manufacturing
- Period and nonmanufacturing
- Product and Direct materials
- Product and Manufacturing
- Product and Manufacturing
- Period and nonmanufacturing
- Product and Manufacturing
- Period and nonmanufacturing
- Period and nonmanufacturing
- Period and nonmanufacturing
- Period and nonmanufacturing
- Product and Direct materials
- Period and nonmanufacturing
- Period and nonmanufacturing
<h3>What are the types of costs?</h3><h3 />
There are period costs which are those which are only incurred in a period of production and are not related to production of goods and services but instead to the selling of them.
Product costs are incurred when the business produces a good or service. They can be direct labor or materials, or a manufacturing overhead that is indirectly related to production.
Find out more on period and product costs at brainly.com/question/13830502.
#SPJ1
<span>First find the area of the field
A=WL
A=(110m)(60m)
A=6,600m^2
Now turn the cm into m
becouse 100cm^3=1m^3
660,000,000cm^3=6,600,000m^3
Now find out how many times you can cover the filled
6,600,000m^3/6,600m^2=100m
So it will be 100m thick.
P.S. I'm assuming you meant you jest forgot the m for 110m.</span>
Answer: It will take 4.4 hours to fill the pool.
Step-by-step explanation: One pump can fill a swimming pool in 8 hours and another pump can fill it in 10 hours. If both pumps are opened at the same time, how many hours will it take to fill the pool?
Aprox. 4.4 hours.
Hope this Helps!