Answer:
- Project completion time: 21 weeks
- Critical Path: B - E - G
- ES, EF, LS, LF are shown below
Explanation:
The earliest start is the latest of the earliest finish times of the predecessors. The earliest finish is the sum of earliest start and duration.
The latest finish is the earliest of the latest start times of the successors. The latest start is the difference of latest finish and duration.
The slack is the difference between earliest start (or finish) and latest start (or finish).
Project duration is the earliest start of the "Project Done" task. For purposes of computing slack, this (project duration) is taken to be the latest finish of the immediate predecessors.
The critical path is the sequence of tasks with 0 slack.
Answer:
B. A large number of very large and small banks
I think
Answer:
Interest will be $5000
So option (A) will be correct option
Explanation:
We have given principal amount P = $500000
Rate of interest = 6 %
Time is November 1 to December 31
So time = 2 months = 0.1666 year
Interest is given by
Interest
So option (a) will be correct option
Answer:
B, Cultural congruence
Explanation:
Cultural congruence is a kind of marketing technique/strategy in which a new product with similar characteristics as with the currently existing product is marketed. This technique of marketing helps to reduce resistance as consumers see the new product as the same as the existing product.
I hope this helps.
Answer:
fails to achieve the minimum average total costs attainable at each level of output.
Explanation:
X Inefficiency do take place in a firm when there is little or no incentive in controlling costs. As a result of this average cost of production will go up than necessary. And as a result of lack of incentives, technically, the firm will be far from efficient. It should be noted that X-inefficiency could be described as a situation in which a firm fails to achieve the minimum average total costs attainable at each level of output.