Answer:
100
Step-by-step explanation:
it is a bit unclear to me, what that problem description means.
if I understand it correctly, than z is directly depending on x².
so, z = 16 for x = 2. x² = 4
I pondered a little bit, as there are several possibilities to connect 16 with 4 as a driving factor (e.g. 2⁴ = 16, 4×4 = 16, 12 + 4 = 16).
I decided to go with the simplest interpretation with the usual meaning of "varies" (multiplication) : 4×x²
that would mean
z = 4×x² = 4×5² = 4×25 = 100
Answer:
13 centimeters per day.
Step-by-step explanation:
We have been given that during summer, the water level of the river increased by 78 centimeters in 6 days. We are asked to find the water level increase rate in centimeters per day.
To find the water level increase rate per day, we will divide total increase by total days as:
Therefore, the water level increase rate is 13 centimeters per day.
Answer:
Step-by-step explanation:
Probability=(2*2)/(4*5)=1/5=20 %