Answer:
a.
Step-by-step explanation:
because > means at most < means at least
Looking at the given points on the right side from (0,2) to (1,6) for 1 increase in X ( 1-0=1) the Y value increases by 3 ( 6/2 = 3)
This same increase happens for th other two points: 18/6 = 3
54 / 18 = 3
The rate of increase is 3.
Answer:
6 1/2 hours
Step-by-step explanation:
not sure
Answer:
$48 per unit
Step-by-step explanation:
Increasing the price by $5 reduces demand by 20 units, so the slope of the curve is -4 units per dollar. This lets us write a demand equation as ...
q = -4(p -50) +184
q = -4p + 384
q = 4(96 -p)
The revenue is the product of price and demand:
r = pq = 4p(96 -p)
This is the equation of a quadratic curve that opens downward and has zeros at p=0 and p=96. The vertex (maximum) will be halfway between the zeros, at ...
p = (0+96)/2 = 48
A price of $48 per unit will yield a maximum total revenue.
Answer:
-8±10x
Step-by-step explanation:
you will follow BODMAS
B=bracket
O= off
D=division
M=multiplication
A=addition
S=subtraction
2×3=6
7×2=14
[6-14±10x-8]÷[x-2]
14±8=22
6-22=-16
[-16±10x]÷[x-2]=-8±10x