Answer:
(a) 2min/15units
(b) 1min/20units
(c) The bottleneck stage is cutting. The process capacity is 450units/hour
(d) The capacity of the new employee should be 1unit/2sec. The process capacity will increase four times
Step-by-step explanation:
(a) Cycle time for stage cutting for 2 employees = 16sec/2units × 1min/60sec = 2min/15units
(b) Cycle time for stage sealing for 1 employee = 3sec/1unit × 1min/60sec = 1min/20units
(c) Process capacity of stage cutting = 15units/2min × 60min/1hour = 450units/hour
(d) If the capacity of the new employee is 1unit/2sec, the process capacity = 1unit/2sec × 3600sec/1hour = 1800units/hour. The process capacity increases 4 times (1800/450 = 4)
Answer:
x=2
Step-by-step explanation:
hope this helps
not sure if im right <3
Answer:
113.1 m
Step-by-step explanation:
Answer:
The blue box is 38 cubic feet grater than the red box.
Step-by-step explanation:
Cuboid:
- It is a three dimensional shape.
- It has 6 faces.
- The surface area of a cuboid is = 2(lb+bh+lh), where l = length, b= width, h= height.
- The volume of a cuboid is = l×b×h
Given that,
Ben has two boxes.
The volume of the red box is 46 cubic feet.
The dimensions of the blue box is 7 feet by 4 feet by 3 feet.
The volume of the blue box is = length ×width × height
=(7×4×3) cubic feet
= 84 cubic feet
The blue box is (84-46) cubic feet =38 cubic feet grater than the red box.
Answer:
No answer
Step-by-step explanation:
x 3 x 2 ≤ 10x â€" 8? {â€"4, 1, 2} (â€"ê, â€"4] (â€"ê, â€"4) u [1, 2] (â€"ê, â€"4] u [1, 2]