Answer:
Materials used in production go to Work in Process so;
= 936 + 1,690 + 767
= $3,393
The materials used in the general factory will go to Manufacturing Overhead.
Date Debit Credit
Jan 31 Work in Process $3,393
Manufacturing Overhead $ 667
Raw Materials Inventory $4,060
Answer:
b. helps identify the variable within a project that presents the greatest forecasting risk.
Explanation:
Sensitivity analysis refer to the financial model that measures how the variable i.e. target one should be impacted and depend on the change in the other variable that we called as an input variable
In this, it would help to identify the variable that lies within the project and provide the high risk of forecasting
Therefore the option b is correct
Answer:
a) 15 to 35 approximately 95%
(b) 10 to 40 approximately almost all
(c) 20 to 30 approximately 68%
Explanation:
The data have a bell-shaped distribution which means the data is equally distributed on both sides of the mean.
We have the mean at 25 and a standard deviation of 5 which means that the interval is for each of the values of 5 .
The mean would be u and
The first value would be u ±σ = 25 ± 5= 20 and 30 (68 % )
The second value will be u ± 2σ= 25± 10 = 15 and 35 (95%)
The third value will be u ± 3σ= 25 ± 15 = 10 and 40 (99.7 % almost all)
In the figure below the light blue region gives u ±σ on both sides of the mean
, dark blue gives u ± 2σ values on both sides of the mean and grey gives
u ± 3 σ values on both sides of the mean.
It is obvious that 68 % of the data is contained in the u ±σ light blue region, 95 % of the data in the u ± 2σ dark blue including light blue and 99.7 % in the u ± 3σ all colored regions.