Answer: 5/1 or just 5
Step-by-step explanation:
Answer:
0.242
Step-by-step explanation:
p = 0.08, q = 1 − p = 0.92, and n = 1000.
The mean and standard deviation are:
μ = p = 0.08
σ = √(pq/n) = 0.00858
The z score is:
z = (x − μ) / σ = -0.70
Using a calculator or z score table, the probability is:
P(Z < -0.70) = 0.242
Answer:
100
Step-by-step explanation:
In unit of batches over days, let r be the planned rate and R be the actual increased rate. The difference between R and r is described as 10 shirts per day.
R-r=10
Rate Time Batches
Planned r 8 1
Actual R 7 1
, the number of batches equivalent to 10 shirts.
OneBatch=560*Shirts
Hope This Helps!!!