let, the days for 10 men be x
- 30/10=x/30
- 900=10x
- x=900/10
- x=90
so 10 men can complete the same work in 90days.
Hope it helps.
For this case, the first thing we must do is define variables.
We have then:
x: altitude of the plane in feet
y: final temperature
The equation modeling the problem for this case is given by:
Thus, evaluating the function for x = 11,000 ft. Height we have:
Answer:
the temperature at an altitude of 11,000 ft is 47.6 F
Answer:
Always
Step-by-step explanation:
we know that
If points A, B, and C lie on a line, the the sum of the length of segment AB plus the length of the segment BC is always the length of segment AC
so
AC=AB+BC
Answer:
(x - 6) meters
Step-by-step explanation:
x² - 12x + 36
x² - 2(x)(6) + 6²
(x - 6)² = side²
side = x - 6