Answer: x>-1
Step-by-step explanation:
Dotted line on the axis is covering y infinitely, so theres an inequality on x, and the line is at -1, so x should be > - 1
Answer:
That means that each water is $2.50, das crazy tho
Step-by-step explanation:
First take 400 and divide it by 2.5 to find the hourly rate. Then divide 600 by the hourly rate (160) to get 3.75 hours. My work is listed below.
Here is the set up:
(1/4)/2 = (9/4)/y
Solve for y.
Answer:
3.04m
Step-by-step explanation:
Time taken to swing the rope = 3.5s
Length of the rope = L
T = 2π√(L / 9.8)
3.5 = 2π√(L / 9.8)
take the square of both sides
(3.5)² =[2π√(L/9.8)]²
12.25 = 39.48 × (L / 9.8)
12.25 = 39.48L / 9.8
39.48L = 12.25 × 9.8
39.48L = 120.05
L = 120.05 / 39.48
L = 3.04m
The length of the rope is 3.04m