Answer:
1)Price has decreased and the effect on quantity cannot be determined
Explanation:
As of good rainfall there is a rise in supply of canola that means the shifting o feh supply curve could be right also the demanded for the vegetable oil would decline that means the demand is falling so the demand curve would shift to the left
Therefore, the equilibrium would fall but it is unable to figure out whether the quantity would rise or not without considering the elasticities of the demand and the supply curve
Hence, the correct option is 1
Answer:
A. True
Explanation:
Bank loans are generally short term for meeting the working capital needs, that depends upon the operating cycle of a company.
Usually that keeps on rotating and extending, as the banks keep on earning interest and the funds are usually not needed, this results in the constant support for business.
Further this facility is only provided to the clients who are performing good and that the clients are viable.
If the balance sheets of the client depicts that they are not financially viable then the bank do not extend the time limits and tries to recover the funds as soon as possible.
I think it would be better if you provided some options to choose. But I think, I know the answer. I think it's one of practice innovative strategies.
The type of cultural intelligent Jiyaing needs is "low-context culture".
There are two terms which are used, high-context culture and low-context culture, both are opposite to each other.In low-context culture, individuals utilize communication principally to trade realities and data; meaning is resulted basically from words; business exchanges are more critical than building connections and trust; and individual welfare and accomplishment are more imperative than the gathering.
Answer:
Safety Stock is 336.62 units
Explanation:
As per given data
Demand = D = 50,000
Ordering Cost = S = $35
Holding Cost = H = $1 per unit per year
Weekly Demand = Demand / 50 weeks = 50,000 / 50 = 1,000 units per week
Weekly Demand during Lead time of 3 weeks = 1000 x 3 = 3,000 units
Standard Deviation = 216.51 units
Desired Service level = 94%
The Z score at 94% service level is 1.55477
Safety Stock = Zscore x standard deviation = 1.55477 x 216.51
Safety Stock = 336.62