The social need is provided when Creekside Corp seeks to satisfy its staff by providing a friendly work environment where everybody gets to know each other.
<h3>What is a social needs?</h3>
This is a need that include friendship, affection, belonging, love etc.
In a workplace, when the physiological and safety needs are well satisfied, then, the employees will be motivated to work effectively.
Therefore, the social need is provided when Creekside Corp seeks to satisfy its staff by providing a friendly work environment
Therefore, the Option C is correct.
Read more about social needs
<em>brainly.com/question/1172032</em>
Answer:
increase by price
Explanation:
because, of quantity let me m know if I am correct I am pretty sure I am
The following hypothetical production possibilities tables are for China and the United States. Assume that before specialization and trade the optimal product mix for China is alternative B and for the United States is alternative U. China Production Possibilities Product: A - B - C - D - E - F Apparel: 120,000 - 96,000 - 72,000 - 48,000 - 24,0000 Chemicals(tons): 0 - 24 - 48 - 72 - 96 - 120 U.S. Production Possibilities Product: R - S - T - U - V - W Apparel: 40,000 - 32,000 - 24,000 - 16,0000 - 8,0000 Chemicals(tons): 0 - 16 - 32 - 48 - 64 - 80a. Are comparative-cost conditions such that the two countries should specialize?
Answer:
$2,000
Explanation:
The computation of the total amount of maintenance cost is shown below:-
Total amount of maintenance cost allocated to the Carpentry Department = (Maintenance fees ÷ Total square feet) × Carpentry Department square feet
= ($12,000 ÷ 36,000) × 6,000
= 0.333 × 6,000
= $2,000
Therefore for computing the total amount of maintenance cost we simply applied the above formula.
Answer:
x1 (1.5)+ x2(2.5) ≤ 80
(1)x1 + (1)x2 ≤ 40
Explanation:
Hi, we have to write a system of equations.
Since a basic model (x1) requires 1.5 hours for assembly, and a deluxe model requires 2.5 hours for assembly, the sum of both products must be equal or less than the assembler’s available hours per week (40).
Since we hired 2 assemblers, we have to multiply the hours available by 2.
x1 (1.5)+ x2(2.5) ≤ 40(2)
Simplifying:
x1 (1.5)+ x2(2.5) ≤ 80
Now, for the finishing is a similar process.
Since both models requires the same time for finishing (1), and there is only one finsisher.
(1)x1 + (1)x2 ≤ 40