To get t on one side, we have to use inverse operations to get rid of the 5.
1. Use inverse operation of multiplication to get rid of 5. Which would be division.
2. Divide both sides by 5.
5t/5 = 7 1/2 / 5
3. Solve.
5t/5 = t and 7 1/2 /5 = 1 1/2
7.5 / 5 = 1.5
Therefore, your answer would be C. divide both sides by 5, and the answer is 1 1/2.
Answer:
the answer is 48.
there is no any answer to hundred
Step-by-step explanation:
we know that,
area of parellelogram=base×height
base=8cm,height=6cm
so, 8×6=48
hope it helps
Are you trying to simplify? if so, the answer is 13u/6
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean and standard deviation , the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:
has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
A it’s only right they is no way you can get more then A and it’s rounded