Answer:
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
What is the probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated?
This is 1 subtracted by the pvalue of Z when X = 16. So
has a pvalue of 0.9082
1 - 0.9082 = 0.0918
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Answer:
B
Step-by-step explanation:
Since the line in the picture rises 1 unit for every 2 units it moves to the right, it has a slope of 1/2. Also, since it intersects the y axis at (0,3), the y intercept is 3. Therefore, the equation of the line is y=1/2x+3, or answer choice B. Hope this helps!
In the figure, the triangle ABC is a right triangle, a is the adjacent leg to the angle B, and b is the opposite side to the same angle.
So, you can use the tangent ratio which relates the angle, the opposite leg and the adjacent leg:
tangent (angle B) = b / a => b = a * tan(B)
=> b = 12 * tan(48°) = 13.33≈ 13
Answer: 13