The formula to calculate standard deviation from probability is \sqrt(n*p*(1-p)). n is the sample size, and 200 in this case (number of putts for practice). p is 80% or 0.8, the probability that he can make it. So the standard deviation is \sqrt(200*0.8*(1-0.8)=\sqrt(200*0.8*0.2)=\sqrt(16)=4.
Answer:
207.24 inch^2
Step-by-step explanation:
A=2*3.14*9+2.3.14*3*8
=56.52+150.72
=207.24 square inches
Answer:
430 minutes total
Step-by-step explanation:
Mo had 35 minutes sessions 14 times. You have to multiply 35 by 14 to get the answer which is 430 minutes.
Make a dot plot of the following set of numbers: 2, 1, 2, 0, 0 , 2, 1, 6, 1, 1, 0. Which number is the peak of the data set?
Phantasy [73]
A. 1
There are more 1’s than any other numbers.
D,A,B,C i think this is correct !